See FAST World run before you license it.
Tell us who you are and what you want to evaluate. We reply with the World Card, the sample pack if you asked for it, and a time for a live walkthrough.
certified image 0.1.9 · 126 active tasks + 2 public samples · 7 sets + hard tier + 2 missions · frontier challenge tier
What the grader gate looks like.
Before a task ships, it has to score 0 when nothing is changed, 1 with the reference fix, and partial credit when part of the fix is missing. These are the recorded results for our first long-horizon mission, from its certification on image 0.1.6; on image 0.1.8 it re-passed the sealed gate (no-op 0, reference fix 1 three times). The walkthrough replays this live.
- task
- long-horizon mission (private evaluation)
- image
- channelforge-world:0.1.6 · linux/amd64
- harness
- Harbor 0.22.0 on our dedicated Linux run server
- recorded
- 2026-09-28 · about 11 minutes for the 4 gate trials
| TRIAL | WHAT IT DOES | M1 M2 M3 M4 · FINAL | SCORE |
|---|---|---|---|
| no-op | changes nothing | ····|· | 0.00 |
| oracle · run 1 | reference fix | ✓✓✓✓|✓ | 1.00 |
| oracle · run 2 | reference fix | ✓✓✓✓|✓ | 1.00 |
| oracle · run 3 | reference fix | ✓✓✓✓|✓ | 1.00 |
| oracle − fix A | one fix withheld | ✓✓·✓|· | 0.75 |
| oracle − fix B | one fix withheld | ✓✓✓·|· | 0.75 |
| oracle − fix C | one fix withheld | ··✓✓|✓ | 0.50 |
0 harness errors. Milestones are shown as m1–m4 because this is a private-evaluation task: what each one checks stays with us.